Eleven quotes went out from a two-truck plumbing shop in the past three weeks. On Thursday night the owner counts the replies: four yeses, two nos, and five that never answered, including a tankless water heater quote for a homeowner who seemed keen on site.
He'd like to check in, but every draft he starts sounds needy. So he doesn't send anything, and by the following week it feels too late to ask. That's how a lot of quotes die: not from a no, but from silence on both sides.
Why quotes go quiet
Silence rarely means the customer has decided against you. More often one of these is going on, and a good follow-up addresses it directly:
- They're busy, and the quote is sitting under forty other emails.
- They're comparing it with another quote and can't tell what's different.
- One of your options confused them, so they put off deciding.
- The total was higher than they hoped, and they're embarrassed to say so.
- Someone else in the house needs to agree, and that conversation hasn't happened yet.
None of these is solved by “just checking in.” Each is solved by a message that makes deciding easier.
The cadence: day 2, day 7, day 14
| Touch | When | Its one job | Channel |
|---|---|---|---|
| 1 | Day 2 | Confirm the quote arrived and invite questions | Short text, if they gave a mobile number for the job; otherwise email |
| 2 | Day 7 | Make deciding easier: recap options, answer the common question, mention a real price-hold date | |
| 3 | Day 14 | Close the loop kindly and ask what decided it | Email or text |
Adjust the spacing to the job. An urgent repair deserves a same-day check; a whole-house repipe or a large deck may need a week before the first real reply. The structure stays the same.
For big-ticket quotes, such as a repipe, a tankless conversion or a large deck, make touch 2 a short phone call and send the day-7 email afterward as the written recap. A two-minute call often surfaces the question the customer hasn't typed, like “can you walk me through option 2?” Confirm they have the quote, ask what's holding them up, offer to adjust the scope, and note what they said on the quote's row.
Flowchart
What happens to a quote after you hit send
- StartQuote sent Tuesday with three options
- StepDay 2: short text checks it arrived and invites questions
- DecisionHas the customer replied?YesA personYou answer, adjust or book; automated follow-ups stopNo
- StepDay 7: email recaps the options and offers a smaller first step
- DecisionDid they say “not now” and name a month?YesA personYou decide whether to check back in the month they named; nothing goes out before thenNo
- StepDay 14: one final note closes the loop and asks why
- DoneQuote marked won, lost with a reason, or no reply
Templates for each touch
These are written for a plumber, with notes for carpenters and electricians. Replace the brackets. If software sends them for you, sign them as your assistant, for example “[Shop]'s assistant, for Dave,” rather than pretending you typed them.
Day 2: the arrival check (text)
“Hi [Name], it's [Shop] following up on the water heater quote we sent Tuesday. Did it come through OK? If any of the three options isn't clear, reply here and we'll explain. No rush. Reply STOP to stop texts about this quote.”
Day 7: the helpful recap (email)
Subject: Your water heater options, side by side
“Hi [Name], a quick recap so you don't have to dig out the PDF. Option 1: [repair, one line, price]. Option 2: [like-for-like replacement, one line, price]. Option 3: [tankless, one line, price]. The question we hear most is [common question], and the short answer is [two sentences]. If the full replacement isn't in the budget right now, option 1 buys you time. These prices hold through [date], because supplier costs change after that. Reply with any question, or pick a time here: [booking link].”
- Carpenters: offer phasing instead of a cheaper option. “We could build the deck this fall and add the upgraded railing in spring.”
- Electricians: if you priced from this week's supplier list, say so honestly. “Wire and breaker prices move, so these numbers hold through [date].”
Day 14: closing the loop (email or text)
Subject: Closing out your water heater quote
“Hi [Name], we haven't heard back, so we'll assume the timing isn't right and close this out on our end. If anything changes, just reply and we'll pick it up (prices rechecked after [date]). If you went another way, would you tell us why? One word is plenty: price, timing or something else. Thanks for considering us.”
The last line does real work. A one-word answer tells you whether you're losing on price, speed or something you hadn't noticed.
When they write back
A reply is where the follow-up stops and you take over. Most replies fall into a few patterns, and it helps to decide your answer before you're reading it on a ladder.
| They say | What it usually means | A good first response |
|---|---|---|
| “It's more than we expected.” | The scope or the option mix doesn't fit the budget | Ask which part matters most to them, then offer a smaller scope or a phased plan |
| “We're getting other quotes.” | They can't compare quotes line by line | Offer to walk through what yours includes, such as permits, haul-away and warranty |
| “Can you do it cheaper?” | They want to know if the price is firm | Explain what drives the number; any change in price is your decision, not the system's |
| “I need to run it by my partner.” | A second decision maker hasn't seen it | Offer a short call or a one-page summary they can share |
Before and after
Eleven quotes, two ways
Wait and hope
- 01Quote emailed from the truck at 7 PM
- 02No reply; owner means to check in
- 03A week passes and asking feels awkward
- 04Customer hires whoever called back
ResultQuotes go quiet and nobody learns why
Planned follow-up
- 01Day 2 text confirms the quote arrived
- 02Day 7 email answers the common question
- 03Day 14 note closes the loop and asks why
- 04Any reply stops the sequence and reaches you
ResultEvery quote ends with a yes, a no or a reason
Stopping rules
Follow-up feels pushy when it ignores what the customer has already said. Write these rules down before you automate anything:
- 01Any reply stops the sequence, even “thanks, still thinking.” A person takes it from there.
- 02Never send a scheduled follow-up while a customer's question sits unanswered.
- 03“Not now” sets a reminder for the month they name. Nothing goes out before then.
- 04STOP, “unsubscribe” or “please don't text me” ends texts immediately, and the request is logged.
- 05Three touches per quote, then it's closed. If they've hired someone else, thank them and stop.
Track every quote in one place
You don't need special software for this. A shared sheet with one row per quote and a status column works: Sent, Question, Won, Lost: price, Lost: timing, Lost: went elsewhere and No reply. Add the date of the next touch so the morning list sorts itself. Our post on tracking leads without a heavy CRM has a full column layout.
Once a month, count the reasons. If “price” dominates, look at your options before your follow-ups. If “no reply” dominates, the first message is probably arriving too late or saying too little.
Pitfalls to avoid
- Invented urgency. A price-hold date is fair when it reflects real supplier costs. “Only two slots left this month” when that isn't true costs more trust than it earns.
- Automatic discounts. Price objections go to you. The system can flag them; it shouldn't negotiate.
- Drifting into marketing. Promoting your spring special by text needs the customer's written consent first. Even a quote follow-up arguably encourages a purchase, which is how federal rules define telemarketing, so if a texting platform sends your follow-ups automatically, add text-consent wording to your quote request form and the follow-ups are covered either way. Our TCPA texting guide explains the categories.
- The same message three times. If touch two repeats touch one, it reads as nagging. Each touch should add something.
Consent rules are a legal question, so treat this as general information, not legal advice, and check your state's rules as well.
Our lead follow-up setups run this cadence on their own and hand every reply back to you. For the calls, estimates and service plans around it, see the plumbers page.