Three EV charger inquiries come in over a weekend. The first: a new EV, an attached garage, and a panel on the garage wall. The second: “how much to install a car charger,” from a 1960s house with the panel in the basement and a detached garage across the yard. The third is from someone renting a condo.
Without screening, Monday means three drives and three panel inspections. With a few photos and questions answered first, the first customer has a ballpark range by Monday morning, the second gets a site visit because there's real work to scope, and the third gets a friendly note about landlord and HOA approval. One drive instead of three.
Where EV charger leads come from
Screening only helps if inquiries are arriving. Look for EV charger work in a handful of places:
- Your own listings. Add “EV charger installation” to the services on your Google Business Profile with a one-line description. Give it its own website page: photos of past installs (the charger on the wall, the conduit run, the panel afterward), the towns you cover, whether you supply the charger or install the customer's, and a form that asks for panel photos up front.
- Customers who already drive an EV. At the end of each install, ask “Do you know anyone else getting an EV?” and leave a couple of cards. A check-in a few weeks later, by a channel they agreed to, asking how charging is going is another natural moment to ask.
- Dealerships. Introduce yourself to the sales and service managers at local dealers that sell EVs, so they have a name to give when a buyer asks who installs chargers.
- Utility and manufacturer programs. Check whether your utility runs a charger rebate program with a participating-contractor list, and whether charger makers keep installer directories. Requirements vary and change, so confirm them with each program directly.
- Builders, property managers and HOAs. New homes with EV-ready circuits, and condo or apartment boards fielding resident requests, can bring several chargers at once.
People who find you this way may be asking two or three electricians at once. A photo request within minutes and an approved range by the next morning is how you win them without driving out to every one.
What to ask before anyone drives out
| Ask for | What it tells you | How to ask |
|---|---|---|
| Panel photo with the door swung open | Breaker layout, open spaces, labels, obvious red flags | “Please open the panel door only. Don't unscrew any cover or touch the wiring.” |
| Close-up of the label inside the door | Manufacturer and ratings, if the label is legible | “If there's a sticker inside the door, a close-up helps.” |
| Main breaker size | The service size you're working with | “The large breaker, usually at the top, has a number on it like 100 or 200. What does yours say?” |
| Major electric appliances | Inputs for a calculation based on the home's loads | “Which of these run on electricity: range, dryer, water heater, heating or heat pump, air conditioning, hot tub?” |
| 12 months of utility usage | Input for your existing-load calculation | “If you can download your usage history from your utility account, please send it.” |
| Charger location and distance | Run length, wall type, indoor or outdoor, trenching | “A photo of the spot, and roughly how many feet from the panel?” |
| Charger type and amperage | Breaker and wire size, and which tier the job lands in | “Do you already have a charger? Is it a plug-in model or hardwired, and what amperage? A photo of its label helps.” |
| Ownership and HOA | Who has to approve the work | “Do you own the home? Is there an HOA?” |
Keep the safety line in every request: open the door, never the cover. If a customer mentions a burning smell, scorch marks or a hot panel, the questions stop. They're told to stay away from the panel and call 911 if there's smoke, and you're paged.
Blurry photos are the most common snag, so send a short retake guide with the first request:
- Turn on a light or use the flash, and stand back far enough to fit the whole panel in one shot.
- Take a second photo close enough to read the number on the main breaker, usually the large one at the top.
- Take a third of the sticker inside the door, straight on, without glare.
- Add one photo of the spot where the car parks, showing the wall or post you'd like the charger on.
Sort leads into tiers you define
Before automating anything, write down the tiers your shop actually sees and what each one gets. These are examples; yours will reflect your market and your prices.
| Tier | What the answers show | What the customer gets |
|---|---|---|
| Standard | Answers you've written down, such as a 200 A main, open breaker spaces in the photo, and an attached garage within [X] feet of the panel | Your approved ballpark range and a booking link |
| Extended | Longer run, detached garage, finished walls or a full panel | A wider range and a recommended site visit |
| Needs review | Smaller service, an older or unfamiliar panel, unclear photos | No range; an electrician reviews and usually visits |
| Not a fit | Renter without approval, outside your area | A polite note explaining why, and what would change it |
One rule matters more than the rest: a lead can be moved up a tier automatically, never down. When the photos are ambiguous, the lead goes to “needs review,” not to the cheapest bucket. Define every tier by answers a customer can give and a photo can show, never by a guess about capacity, and have an electrician glance at the photos before any range goes out.
Flowchart
How an EV charger inquiry gets screened
- StartEV charger inquiry arrives Saturday night
- DecisionAny mention of burning smell, scorch marks or a hot panel?YesA personSafety basics sent; on-call electrician pagedNo
- StepReply asks for panel photos, breaker size, electric appliances, charger type and spot
- DecisionAre the photos clear enough to read?NoStepCustomer gets a short guide to retaking themYes
- DecisionDo the answers meet your written criteria for a tier?NoA personElectrician reviews and decides: visit, call or declineYes
- A personElectrician glances at the photos and confirms the tier
- StepCustomer gets that tier's ballpark range, marked clearly as not a quote
- A personElectrician runs the load calculation before any final price
- DoneVisits booked only for real jobs, with photos already in the file
Approved ranges, not quotes
A range answers the price-shopper's real question without committing you. Word it so nobody can mistake it for a quote:
“Based on your photos, this looks like our standard install, which usually runs $[X] to $[Y] and includes [what's included]. That's a ballpark, not a quote. Permit fees, utility work, trenching and wall repair aren't included. Your final price comes after one of our electricians confirms your panel can carry the load, which may mean a short visit. Book a time here: [link].”
Update the ranges when material prices move, and review every lead that got a range against what the job really cost. If the ranges keep landing low, the tiers need adjusting, not the customers.
Before and after
A weekend of EV inquiries
Drive out to every lead
- 01Each inquiry gets a call back and a visit offer
- 02Monday afternoon goes to three panel inspections
- 03One wanted a number, one rents, one is a real job
- 04Quotes go out late in the week
ResultA day spent, one real project
Photos first
- 01Each inquiry gets a photo request within minutes
- 02Standard job gets a ballpark range by Monday
- 03Renter gets a note about landlord approval
- 04One visit, for the detached-garage job
ResultOne drive, and every customer gets an answer
The load calculation stays with you
Photos screen a lead; they don't size a service. The NEC lets an electrician determine the existing load on a service from actual maximum-demand data covering a year, with an exception for a recorded 30-day measurement when a year isn't available. In the 2023 edition that's section 220.87; the 2026 edition moved load calculations to Article 120, where it's 120.87. That route has a catch: the maximum demand at 125 percent, plus the new load, must fit within the service rating, so a home with a high peak can fail it even when monthly bills look modest.
That's why a year of usage history is worth asking for, with a caveat: a typical monthly bill shows total kilowatt-hours, not peak demand. Some utilities offer interval data through the customer's online account. Whether the data a customer sends is good enough for the calculation is your call, as are load management, a subpanel or a service upgrade.
Another route is the code's calculation for existing dwellings (220.83 in the 2023 edition, also moved into Article 120 in 2026), which works from floor area and the home's appliances; that's why the appliance question is in the table. Which edition applies, and with what local amendments, depends on your jurisdiction.
Utility coordination and the tax credit question
When a job needs a service upgrade, the utility becomes part of the schedule: disconnect and reconnect requests, sometimes a meter change, and an inspection release before power comes back. Tell the customer early that the utility sets part of the timeline, and track each request on the job so nothing waits on a sticky note.
Customers still ask about the federal credit for home chargers. According to the IRS, the alternative fuel vehicle refueling property credit applies to eligible property placed in service through June 30, 2026, so installs after that date don't qualify. Customers whose charger was placed in service by that date may still claim it if it qualifies: the IRS requires a principal residence in an eligible low-income or non-urban census tract, and the credit is 30% of the cost up to $1,000 per charging port. Send them to the IRS page and their tax preparer rather than judging eligibility yourself, and point them to utility and state programs, which change often.
Treat this as general information, not engineering, tax or legal advice; code adoption, permits and incentives differ by state and city. For the broader version of this screening approach, see our guide to qualifying contractor leads. We build this kind of photo screening into lead follow-up for electricians, and the ranges and load calculations stay yours.
Sources
- NFPA: NEC Code-Making Panel 2 Second Draft output, Second Revision No. 7849, Section 120.87 Determining Existing Loads (2026 NEC cycle)
- NFPA: NEC Code-Making Panel 2 First Draft output, listing public input on Section 220.87 of NFPA 70-2023
- NFPA: National Electrical Code Handbook (2026), replacement page showing Article 120, Branch-Circuit, Feeder, and Service Load Calculations
- IRS: Alternative Fuel Vehicle Refueling Property Credit for Individuals